CO129-238 - Governor Des Voeus - 1888 [7-8] — Page 416

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

413

to the dimensions shown in the draw-

Ing

and will be toothed in with the

achlar lur. The concrete as

well

so the

bedding and grouting of ashlar blocks will be done with a

tide so

A o

falling to secure setting. Be-

hind the concrete backing will be

carried

up

a

backing of

Emall

rubble.

Filling

The Embankment or filling in

be

m.

hind the breach wall will be begua

when the purre perdue.

ound

hov

reached the level of low water

and will be continued as much

Lo

possible simultanconely with the progress of the wall itself. The filling in will be of red loam obtained from cliff excavations at Kennedy

suburbs situated at the

town, a

extreme weat

of

the

City.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.